Tuesday 12/8/14.
8pm – 9pm.
Litter pick on Ballynahinch Road.
1 bag of litter collected.
Work has begun on the upgrade of The Square. Saintfield’s car parks are still readily accessible and traders are very much open for business. Visitors should not be put off from visiting Saintfield!
The two-way traffic system is operating well. Visitors should not be put off!
10.30 – 13.00 on the Crossgar Road: 26 bags collected.
(13 from traffic lights to Old Grand Jury Road and 13 from Old Grand Jury Road to Gateway sign.)
15.30 – 17.30 on the Ballynahinch Road from the 30MPH sign to Drumaconnell Road: 9 bags of waste lifted.
The upgrade of The Square on Comber Street is scheduled to commence on Monday 4th August. More details of the scheme can be found HERE.
SDA’s Green Saintfield Committee members have been out on the roads again:
Date: Thursday 31st July 2014
Time: 7.00pm to 9.00pm
Flower bed weeded at Saintfield High School – 3 bags
Footpath on Belfast Road cleaned to Comber Road – 7 bags of dirt
Traffic island at Ballgowan Road junction tidied up – 1 bag of dirt and 1 bag of litter
12 bags of litter, weeds & dirt collected on the night
Saintfield Development Association’s Green Saintfield Committee have been in action again:
Date: Wednesday 30th July 2014
Lisburn Road
5 bags of litter collected
Recent Comments