Lower Main Street Upgrade – Week 7

A temporary road surface has now been applied to both sides of lower Main Street. The new lamp posts have been delivered as can be seen in the photograph below.

Lower Main Street Upgrade – Week 6

At each of the entries the setts have been lifted, cleaned and re-laid.

Lower Main Street Upgrade – Week 6

A Stop-Go system has been in operation as work progresses on Main Street past its junction with Downpatrick Street and The Square.

Lower Main Street Upgrade – Week 6